Street Trash (2024)
The second feature film by multi-award winning director Ryan Kruger (Fried Barry) and from the co-creators and producers of The Last Drive-in with Joe Bob Briggs, STREET TRASH is a spiritual sequel to the 80's cult classic, shot in 35mm Techniscope and filmed entirely on location in South Africa as a Cineverse/Screambox original. Executive produced by Roy Frumkes and Jim Muro, creators of the original Street Trash, and featuring impressive and explosive meltdown effects sequences designed by Kevin Bitters (Mad Max: Fury Road) and Adrian Smith (Resident Evil: The Final Chapter), Vinegar Syndrome Pictures presents the world Blu-ray debut of this gory and slimy action-comedy!
Horror/Comedy ‧ 1h 25m
Director: Ryan Kruger
Writer: Ryan Kruger
Cast: Sean Cameron Michael, Donna Cormack Thomson