Night of the Reaper (2025)
Another original for Shudder and Not the Funeral Home for their second collaboration with director, Brandon Christensen. In the heart of a quiet, 1980s suburb, college student Deena returns home and reluctantly takes on a last-minute babysitting job. That same night, the local sheriff receives a cryptic package that pulls him into a sinister scavenger hunt that sets off a game of cat and mouse with a dangerous killer. As the clues unravel, Deena finds herself ensnared in a nightmarish mystery that she may not survive. Night of the Reaper made its debut at the 2025 Popcorn Frights Film Festival in Miami, winning Scariest Feature Film ahead of it’s Shudder debut in September 2025.
Horror/Thriller ‧ 1h 33m
Director: Brandon Christensen
Writers: Brandon Christensen, Ryan Christensen
Cast: Jessica Clement, Ryan Robbins, Summer H. Howell, Keegan Connor Tracy